Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Are You Ready? Revisions to Management of Fill Policy Take Effect Jan. 1

usscmc by usscmc
December 19, 2019
Are You Ready? Revisions to Management of Fill Policy Take Effect Jan. 1
Share on FacebookShare on Twitter

Candee Wilde, Greenberg Traurig Candee Wilde, Greenberg Traurig

As the economy strengthens, development and infrastructure projects continue on an upward trend in the region. Whether the project involves remediating a brownfield site or performing utility work in a public right-of-way, the management of fill material such as soil, rock or stone is often a primary consideration impacting the project’s budget. In the commonwealth of Pennsylvania, the Pennsylvania Department of Environmental Protection (the DEP or department) generally regulates the management of fill material, however projects involving PCB-containing fill are under the oversight of the U.S. Environmental Protection Agency (EPA). On Nov. 2, the DEP issued a revised management of fill policy (the policy), which makes sweeping changes to the existing policy in effect since Aug. 7, 2010. The policy supplements existing requirements outlined in Pennsylvania’s Solid Waste Management Act municipal and residual waste regulations and provides guidance on the management of clean fill and regulated fill in the commonwealth. See 25 Pa. Code Section 271.1 and § 287.1. Many industries, ranging from developers to soil recycling facilities to soil brokers, must get up to speed by Jan. 1, 2020 when the policy takes effect.

What Is the Policy?

At its core, the policy provides comprehensive guidance on fill movement activities within the commonwealth. It is inapplicable to materials reused in the newly defined project area or right-of-way or for mine land reclamation activities. Under the policy, clean fill generally can be used in an unrestricted manner and is permitted to be managed without oversight of the department (although Form FP-001 is required to track the movement of clean fill). By contrast, the use of regulated fill is restricted to placement at nonresidential properties only.

A person managing regulated fill must obtain General Permit WMGR096 in many cases. The new changes to the policy clarify that the permit is required only if regulated fill is used outside of a project area or right-of-way of a project area. Further, a permit is not required for management of regulated fill entirely at an Act 2 site or when regulated fill is moved from one Act 2 site to another Act 2 site. Notwithstanding these exemptions, the management of fill within a site may still be limited to some extent depending on what is appropriately characterized as the “project area” or the “Act 2 site.”

How Has the Policy Changed?

The new policy more than triples the number of defined terms and makes numerous changes to existing terms. Fill is newly defined to include clean fill, regulated fill and historic fill. The definition of clean fill was revised to mean as “uncontaminated, nonwatery-soluble, nondecomposable, inert solid material used to level an area or bring an area to grade.” The term makes reference to the definition of uncontaminated or uncontaminated material, which has been expanded to mean fill unaffected by a release of a regulated substance or fill affected by a release of a regulated substance but within the new clean fill concentration limits (CFCLs).  Regulated fill now means fill material “that has been affected by a release of a regulated substance and is not ‘uncontaminated material.’” Although the concept was previously included in the policy, the definitions of clean rill, regulated fill and uncontaminated or uncontaminated material now all repeat the prohibition on blended, mixed or treated fill that would otherwise fail to meet the applicable numeric concentration limits if not blended, mixed or treated.

Under this policy, the department endorses a hands-off approach allowing the fill market to function largely without restriction or Department oversight, while also providing detailed—and more burdensome—guidance on performing appropriate due diligence. The policy establishes various protocols for performing a fill determination, determining whether fill can be placed in donor location, and sampling waste piles and in situ material. A fill determination must be completed prior to moving fill to a receiving site. As part of this process, fill must first be determined eligible for management as clean fill or regulated fill under the policy—e.g. it is not excluded or under the jurisdiction of another agency. Then, environmental due diligence is required to determine whether the material has been affected by a release. Due diligence is performed on a case-by-case basis, and not every instance will require analytical testing. Except for historic fill, pre-testing is not required unless a property history review and visual inspection suggest a release of a regulated substance has impacted the fill. Historic fill can be managed as clean fill if the testing results are within the CFCL. There is some concern that the more onerous due diligence requirements set forth in this policy will complicate even the smallest projects, requiring the need of environmental professionals to guide homeowners and private citizens through the process.

In the event testing is required, the policy sets forth detailed requirements for analytical testing in Appendix A, including the development of sampling plans, sampling procedures for fill piles and in-situ fill, evaluation of data, and testing methodology. The technical requirements could be cost prohibitive or excessive for certain projects. As one example, the department now allows fill that contains constituents with exceedances of a CFCL or a regulated fill concentration limit (RFCL) not known to be associated with a release from a known source to be used at a receiving site when background demonstrations are performed at the donor site to show that exceedances are the result of background conditions. Equivalent site evaluations must then be performed to ensure the receiving site conditions also contain the same substances in higher concentrations. At a minimum, 40 samples are required before establishing that the fill can be used at the receiving site. For certain naturally occurring constituents that by nature exceed background levels, this level of effort may be heavy handed. Although other states like New Jersey set default background standards, the department has yet to evaluate whether similar standards can be used as a default where testing at receiving sites would otherwise be too onerous.

What Are the New Numeric Standards?

The prior version of the policy established static numeric standards for clean fill based on the residential cleanup standards under the Land Recycling and Environmental Remediation Standards Act (Act 2) which were in place at the effective date of the prior policy. This new policy takes a risk-based approach to regulating the management of fill. It directly incorporates the statewide health standards (SHSs) set forth in the Act 2 and the applicable regulations as the basis for determining newly defined CFCLs and RFCLs. These SHSs are updated every three years based on the most up-to-date scientific information.

Those impacted by this policy must stay informed of changes to the CFCLs and RFCLs as updates are made to the Act 2 SHSs because the changes could significantly impact the bottom line of a project. The current standards are conservative and limit what types of fill can be characterized as clean fill. For example, the standard for benzo(a)pyrene—prevalent in many fill materials due to historic burning of coal and exhaust or presence of asphalt—is now lower than background in many areas. Vanadium also has new standards below background. These standards effectively result in the potential outcome that no fill may be considered clean fill in Pennsylvania. As a result, companies with material that previously could be managed as clean fill in Pennsylvania may have to pay more per cubic yard to manage the fill due to the lack of placement options.

What Is EPA’s role?

There has been a shift in the implementation of the EPA’s Toxic Substances Control Act (TSCA) program in Pennsylvania associated with the management of fill in recent years. Although the new policy provides some guidance on fill containing Polychlorinated Biphenyls (PCBs), the Department is clear that PCBs must be managed in coordination with state programs and TSCA, which the DEP has no delegated authority to implement. Under the policy, the DEP requires that EPA provide written approval before fill containing a total PCB concentration exceeding 2 parts per million (ppm) can be managed under state oversight, even though the CFCLs and RFCLs for some aroclors exceed 2 ppm. Further, any fill suspected of being TSCA-subject due to a release of PCBs requires EPA approval prior to performing a fill determination. No program currently exists between the DEP and EPA to facilitate these approvals. It remains to be seen how smoothly and quickly the process will be with both agencies having some level of involvement.

What’s Next?

The regulated community will undoubtedly need time to digest the changes within this policy in order to avoid delays in projects or costly arrangements for the placement of fill at more expensive locations or facilities. In addition, the community will also need to prepare for future changes in the numeric standards or other requirements. The revisions to this policy precede an anticipated overhaul of General Permit WMGR096, which is the permit required by the policy for the beneficial reuse of regulated fill. Like the policy, the most recent draft revisions of the general permit were harshly criticized as requiring onerous conditions relating to application, reporting, due diligence, testing and other requirements. The DEP intends on allowing another 60-day notice and comment period prior to finalizing the changes to the permit.

Candee Wilde practices in the environmental group of Greenberg Traurig. She resides in the Philadelphia office. As part of her practice, she advises developers in the purchase and remediation of brownfields properties and businesses operating in the fill industry. Contact her at [email protected].

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com