Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Cuts begin to D-Y school plan – News – capecodtimes.com

usscmc by usscmc
January 17, 2020
Cuts begin to D-Y school plan – News – capecodtimes.com
Share on FacebookShare on Twitter

Committee must pare $5M from project to offset rising costs during litigation.

SOUTH YARMOUTH — The Dennis-Yarmouth School Building Committee began the tough job of paring $5 million from plans for the new regional middle school Thursday, working from a list of possible cuts put together by project architects and management team members.

Although no final decisions were made, the list of possible cuts ranged from a $30,000 change from metal paneling to drywall for the ceiling in the school vestibule to a $2.2 million synthetic turf sports field.

The plan to build a $117 million school for Dennis and Yarmouth students had been stalled by litigation for about a year.

Plans call for the school to house grades 4-7 on a district-owned site on Station Avenue in South Yarmouth, replacing the aging Mattacheese Middle School in West Yarmouth and Nathaniel H. Wixon School in South Dennis.

Steadily rising construction costs while two court challenges to the project played out have meant that $5 million must now be slashed from the bottom line before final plans can be drawn.

Thursday marked a first run-through of project costs for the building committee, which had not met in more than a year. Reductions were not formally voted on, but project managers from PMA Consultants will use the list to show officials at the Massachusetts School Building Authority that it is possible to get the project back in the black.

Reductions could not affect the educational plan the construction project was developed to meet. They also were made to areas where costs are not reimbursible via the $44 million in state funding.

The proposed reductions include a change in curb materials from granite to precast concrete; elimination of a $446,500 irrigation system at all athletics fields with the intention of seeking alternative ways to pay for the system; a change in athletic field material from sod to seed to recoup about $200,000; elimination of a planned soccer field at the Station Avenue front; 50% reduction in fitness course equipment; reduction of 50% in plantings; and reduction in lockers to 50% of the enrollment to save $95,000.

Chad Crittendon, of PMA Consultants, ran through the list for the building committee. Sitting on that panel are two selectmen from each town, town administrators, Dennis-Yarmouth teachers and school administrators, schools Superintendent Carol Woodbury and Assistant Superintendent Kenneth Jenks, and some members at large.

Schematic designs for the new school are finished, but final designs must be drawn by May 5. Before that can be done, architects at Perkins Eastman have to know what is being eliminated. The building committee is expected to formally vote on its recommendations Feb. 13.

Construction bid packages will go out early next year, with a February 2021 deadline for bid submissions, if the project stays on track.

Construction should start shortly after that. The school will likely be ready to move into by late 2022.

Follow Christine Legere on Twitter: @ChrisLegereCCT.

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com