Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

The public procurement bidding process in Mexico

usscmc by usscmc
January 18, 2020
Share on FacebookShare on Twitter

All questions

The bidding process

i Notice

According to the Procurement Laws, the call for competition for public contracts must be advertised in an electronic system called CompraNet, which is a governmental access-free mechanism. Among other things, the following information must be provided:

  1. name of the contracting entity;
  2. if the bidding process is national or international;
  3. description of the goods, leases, services or works that are going to be contracted;
  4. requirements to participate in the bidding process;
  5. criteria for evaluation of proposals and for the award of contracts; and
  6. draft of the contract.

Additionally, a summary of the call must be published in the Federal Official Gazette (DOF) including at least: (1) purpose of the bidding process; (2) volume of good, lease, services or public work to be procured; (3) number of the bidding process; (4) schedule process; and (5) the date on which the call was published in CompraNet.

Although autonomous constitutional bodies have their own regulations regarding public procurement, the rules established in those regulations for bidding process are quite similar from those established in the Procurement Laws.

On the other hand, as a result of Mexico’s 2013 energy reform, procurement of hydrocarbons and electricity are out of the scope of the Procurement Laws and Pemex and the CFE have their own special regulations. Regarding hydrocarbons, private companies are currently able to enter into contracts with the state productive company Pemex for the exploration and extraction of hydrocarbons in oil fields under the special rules applicable. In a nutshell, the Ministry of Energy decides the form of public procurement process and establishes the guidelines of the call, as well as the draft of the contract, while the SHCP establishes the fiscal terms of such contracts. After that, the National Hydrocarbons Commission prepares and publishes the call, carries out the bidding process and awards the contract. The procedure for procurement of electricity is practically the same as the above, but carried-out by the CFE.

ii Procedures

In general terms, according to Article 134 of the Mexican Constitution and the Procurement Laws, the public procurement procedure must be conducted in the following manner:

  1. A call for competition must be published in CompraNet.
  2. At least one clarification meeting must be carried out. There must be at least six calendar days between the clarification meeting and the next stage of the procedure (submission and opening of proposals).
  3. Proposals must be submitted and publicly opened. Between the call for competition and the submission and opening of the proposals there must be at least: 20 calendar days for international biddings, and 15 calendar days for national biddings.
  4. All proposals must be evaluated in accordance with the bidding rules. The contracting entity shall issue a decision awarding the contract to the tender that meets the applicable requirements.
  5. The contract must be signed during a period of 15 calendar days after the award of the contract is declared.

The Procurement Laws provide that the bidding process may be carried out using electronic means, in which case the whole process must be carried out through CompraNet using electronic identification means.

In the bidding process of oil fields, it is not possible to use electronic means since the submission and opening of the proposals are broadcasted live on the National Hydrocarbons Commission website. In contrast, the entire bidding process of electricity projects could be done on the CFE’s procurement electronic system.

iii Amending bids

Before issuing a call for competition, public entities are able to publish the project on CompraNet during at least 10 business days to receive relevant feedback from potential bidders. Comments and opinions received shall be analysed by public entities aiming to consider them in the final bidding document.

The contracting entities may change some terms and conditions of the bidding rules, provided that such changes are issued at least one week before the submission and opening of the proposals. All changes must be published on CompraNet.

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com