Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Wind and solar bodies urge Minister to urgently publish determinations needed to kick-start power procurement

usscmc by usscmc
January 29, 2020
Wind and solar bodies urge Minister to urgently publish determinations needed to kick-start power procurement
Share on FacebookShare on Twitter

The heads of South Africa’s wind and solar industry bodies urged Mineral Resources and Energy Minister Gwede Mantashe on Tuesday to publish, without delay, the Ministerial determinations required to unlock the procurement of much-needed electricity capacity in line with the Integrated Resource Plan (IRP 2019), promulgated in October.

Addressing members of the National Press Club in Pretoria, South African Wind Energy Association (SAWEA) CEO Ntombifuthi Ntuli and South African Photovoltaic Industry Association (SAPVIA) chairperson Wido Schnabel reported that their members had projects that could be implemented on an accelerated basis and in line with the Department of Mineral Resources and Energy’s (DMRE’s) recent call for proposals that could be grid-connected in the “shortest time and at the least possible cost”.

The call was made in a request for information (RFI), the deadline for which is January 31, for supply and demand options to close what is at least a 3 000 MW capacity gap, but which a recent Council for Scientific and Industrial Research (CSIR) report calculates could be as large as 8 000 MW. The CSIR also warns that the country’s energy shortfall, which was above 1 350 GWh in 2019 (the country’s worst-ever load-shedding year), could grow to nearly 2 000 GWh this year and peak at about 4 600 GWh in 2022.

A full month as been allocated for the evaluation of the RFI responses, after which an emergency procurement process is expected to be initiated.

SAWEA and SAPVIA believe that the RFI process should not hold back the implementation of the IRP 2019, however, and that the fifth bidding round of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) should be launched in parallel, given both the crisis and that previous bidding rounds have typically required between 18 and 24 months to complete.

Lead times could be compressed in the next bidding round, owing to the fact that some 90 projects had already been identified in 2015 under the ironically named ‘expedited round’ – that round eventually expired after years of delay, precipitated by Eskom’s refusals to enter into new power purchase agreements (PPAs) with independent power producers (IPPs).

Schnabel reported that several solar PV developers had already indicated to him that their projects could be reinitiated within weeks, owing to the fact that the regulatory approvals, including environmental authorisations, were in hand.

Ntuli said that the DMRE had indicated to SAWEA that the Ministerial determinations were serving before the Minister. However, he still needed to seek the concurrence, following public consultation, of the National Energy Regulator of South Africa (Nersa). “We are eagerly waiting for the process to unfold so that we can get into procurement under round five.”

The determinations, which are issued under Section 34 of the Electricity Regulation Act, are required to facilitate the procurement of technologies outlined in the IRP. They can also provide for any deviations from the IRP 2019, which may be required to facilitate some self-generation projects, particularly those larger than 10 MW where the PPA is between a corporate and an IPP.

“Given that wind and solar PV are South Africa’s cheapest new-build option, moving ahead with procurement immediately is a no-regret move,” Schnabel averred.

In light of the RFI, however, SAPVIA and SAWEA members were also likely to submit all their projects for consideration under Medium-Term Power Procurement Programme 2019.

In addition, existing solar PV and wind plants were likely to outline what additional electricity they could inject into South Africa’s grid over and above the export thresholds outlined in their existing PPAs.

In its report, the CSIR estimates that existing renewables plants could provide an additional 200 MW to 500 MW of electrical energy and recommends that the IPP Office be given the mandate to make adjustments to existing PPAs to capture that additional energy.

“The wind industry has proposed some short-term solutions, including lifting the energy cap of the 2 GW fleet of operational wind farms, which are able to produce slightly more energy than is currently allowed for under the PPAs.”

Likewise, all the solar PV farms have the ability to produce more electricity than allowed for under their respective PPAs.

CSIR’s Jarrad Wright says one of the quickest ways to add more energy into the constrained grid would be to increase maximum export capacity where possible and adjust PPAs accordingly.

The additional energy gained from what he terms the ‘power-up’ of the REIPPPP plants would be relatively modest, but adds that “every megawatt can help” in the current context.

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com