Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

As You Head Back To Work Monday, Here Are The Traffic Delay Spots To Watch : NorthEscambia.com

usscmc by usscmc
February 9, 2020
As You Head Back To Work Monday, Here Are The Traffic Delay Spots To Watch : NorthEscambia.com
Share on FacebookShare on Twitter

Drivers will encounter traffic disruptions on the following state roads and projects in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

Escambia County:

  • U.S. 29 Widening from Interstate 10 (I-10) to Nine Mile Road (State Road (S.R.) 10 / U.S. 90A)– Drivers will experience the following traffic impacts the week of Sunday, Feb. 9.
    • Detroit Boulevard will be closed west of U.S. 29 at the railroad tracks from 8 p.m. Sunday, Feb. 9 to 6 a.m. Monday, Feb. 17 for railroad reconstruction. Detroit Boulevard between Untreiner Avenue and U.S. 29 will be open to local traffic only. All other traffic will be directed to Hannah Street, Untreiner Avenue, and Broad Street.
    • Nine Mile Road at the U.S. 29 Overpass:  Alternating lane shifts as crews construct the new southbound bridge.
  • U.S. 29 traffic between I-10 and 9 1/2 Mile Road may experience alternating lane closures as crews continue drainage and paving operations.
  • Pensacola Bay (U.S. 98) Bridge Replacement– There will be intermittent lane closures at the following locations from 8 p.m. to 5 a.m. the week of Sunday, Feb 9.
    • U.S. 98 east and westbound, from North 14th Avenue in Pensacola to east of the Pensacola Bay Bridge in Gulf Breeze.
    • North 17th Avenue in Pensacola between U.S. 98 and the Graffiti Bridge.
  • S.R. 97 Routine Maintenance from U.S. 29 to the Alabama State Line– The outside lane will be closed from 8 p.m. to 5 a.m. Sunday, Feb. 9 as crews replace pavement markers.
  • Nine Mile Road (S.R. 10 / U.S. 90A) Widening from Pine Forest Road (S.R. 297) to U.S. 29 – New Market Street will be closed at the intersection of Nine Mile Road beginning at 7 a.m. Monday, Feb. 10 as crews perform drainage work.  These operations are anticipated to take seven to ten days to complete. Traffic will be detoured to Parkside Street and Milestone Boulevard.  Signs and variable message boards will be in place to alert drivers of the temporary closure and alternate route.
  • ·        I-110 Striping Operations from Gregory Street to Davis Highway– There will be intermittent and alternating lane restrictions from 8 p.m. to 5 a.m. Monday, Feb. 10 through Wednesday, Feb. 12 as crews stripe and place pavement markers along the roadway.
  • ·        Nine Mile Road (S.R. 10 / U.S. 90A) Widening from Beulah Road to Pine Forest Road (S.R. 297) – The far-right portion of the I-10 off ramp that connects to Nine Mile Road (Exit 5) westbound remains closed. Drivers can still access Nine Mile Road east and westbound using the other section of the ramp. The partial ramp closure is needed to reconstruct the ramp and will be in place for through March 2020.
  • ·        U.S. 29 Resurfacing from south of Muscogee Road (County Road/C.R. 184) to Atmore Highway (S.R. 97)– Crews continue paving operations and median work.  Drivers may encounter intermittent daytime lane restrictions. Motorists are reminded to watch for crews and heavy equipment entering and exiting the roadway.
  • ·        Hanks Road Bridge Replacement over Breastworks Creek– Crews continue roadway earthwork and preparations for base material. The roadway remains temporarily closed. Drivers on Hanks Road, west of the bridge, are detoured to C.R. 99 and C.R. 4. Drivers east of the bridge will utilize Pine Barren Road. The project is anticipated to be complete spring 2020.
  • C.R. 168 Bridge Replacement over Unnamed Branch in Northwest Century– Traffic has been transitioned to the new bridge.  Crews are working on grading, concrete ditch pavement, and removal of the temporary acrow bridge.  Watch for workers and heavy equipment entering and exiting the roadway.

Santa Rosa County:

  • ·           Stewart Street (S.R. 87) Road Closure from Raymond Hobbs Street to Elva Street for Parade– Stewart Street will be closed between Raymond Hobbs Street and Elva Street in Milton from 5 p.m. to 11 p.m. Saturday, Feb. 8 for the Mardi Gras Parade.
  • ·           U.S. 98 (Pensacola Bay Bridge) Replacement– There will be intermittent lane closures at the following locations from 8 p.m. to 5 a.m. the week of Sunday, Feb 9.
  • ·           U.S. 90 Corridor (Pace) Management Improvement Project- Crews are currently working on drainage improvements.  East and westbound lane closures at Bostic Lane will be in effect from 9 p.m. to 5:30 a.m.
  • ·           U.S. 98 Safety Improvement from Villa Woods Circle to Ortega Park Drive– Construction activities continue at the following seven locations: Villa Woods Circle to Marble Court, Oriole Beach Road, Grand Ride Circle to Fordham Parkway, El Rito Drive/College Parkway, American Avenue, Alpine Avenue, and west of Ortega park Drive. Crews continue curb and gutter, traffic separator, roadway work, and irrigation repairs.  Lane closures will be in effect from 9 p.m. to 5:30 a.m.
  • ·           S.R. 4 Resurfacing and Drainage Improvements from the Escambia River Bridge to Market Road (C.R. 87A) in Jay– There will be shoulder closures throughout the project limits for roadway and utility work.
  • · S.R. 87 Bridge Rehabilitation and Repair Over Yellow River- Motorists may encounter daytime southbound lane closures as crews continue expansion joint work.
  • · S.R. 87 Turn Lane and Median Modifications at South Lynn Road- Operations are taking place in the median. Motorists can expect intermittent daytime lane closures.
  1. U.S. 98 east and westbound, from North 14th Avenue in Pensacola to east of the Pensacola Bay Bridge in Gulf Breeze.
  2. North 17th Avenue in Pensacola between U.S. 98 and the Graffiti Bridge.

All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather.

Written by William Reynolds · Filed Under FRONT TOP 

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com