Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

‘It’s felt life-ruining’: flat owners face huge bills for new cladding | UK news

usscmc by usscmc
February 22, 2020
Share on FacebookShare on Twitter

Residents of flats in Greater Manchester facing huge bills to replace flammable cladding have told of “anxiety so extreme I can’t function” and feel they are members of “generation stuck”.

A survey carried out by the Greater Manchester High Rise Task Force found 53% of owner-occupiers in tower blocks had been hit with increased service charges after the Grenfell Tower fire.

One resident said their monthly charge had increased from £90 to £480 to cover cladding replacement, with another saying their management company had proposed the cost be added to their maintenance charge to the tune of £1,000 a month.

Many leaseholders are unable to sell their homes and move on because lenders will not offer mortgages, the research found. About 70% of residents said they were worried about a fire in their building and spoke of their increasing levels of anxiety, difficulty sleeping and feeling of being trapped.

In 2014, Matthew Hallsworth and Natasha Johansson bought a flat in Albion Works, a timber-clad block in the New Islington area of central Manchester. The couple, who married six months ago, said they had sought counselling after feeling “at the end of our tether”.

“Nobody seems to be thinking of our mental safety,” said Johansson on Friday. “The anxiety is so extreme I can’t function. We’ve constantly got this money hanging over our heads through no fault of our own. I go to work and can’t concentrate, I come home, look at these four walls and think: ‘Will they set on fire, will I be bankrupted?’ How can you relax in this flat, knowing it’s a fire risk? Right now the reality is I’m more of a danger to myself than a fire.”

Fire officials also found alarms could not be heard in the flats, only in the hallways. With the policy changed from “stay put” to “evacuate” following the Grenfell Tower disaster, the building managers, Residential Management Group (RMG), said fire wardens would patrol until a new fire alarm system was installed. The 24-hour “waking watch” involves five fire wardens patrolling the 182 flats of blocks D and E, costing residents £10,000 a week plus VAT. The 12-hour shifts are being covered by an extra service charge, yet to be levied, and the residents’ reserve fund.

“We haven’t had an evacuation or tested anything with the waking watch. Their procedure – which we only know because the BBC reported it – is to shout ‘fire, fire, fire’ and knock on ‘as many doors as possible’ in the event of a fire,” Johansson said.

“We need a new boiler but at the moment we buy food at the supermarket and think: ‘Will we be able to afford this in a month’s time?’ All that money from our guests from our wedding might have to be spent on cladding.”





Albion Works block from outside



The block’s timber cladding is not covered by the government fund that covers aluminium composite material, leaving leaseholders to pay for it to be replaced. Photograph: Joel Goodman/The Guardian

Having sought help from charities, the Leasehold Advisory Service, the housing minister and their MP, the couple found nobody was able to help them because their contract says they are expected to foot the bill for “reasonable maintenance costs”. “Legally, we have no protection. It’s like we’re writing a blank cheque to be imprisoned in our own home. We literally can’t move,” Johansson said.

The couple said it was an injustice that timber cladding is not covered by the government’s fund that covers ACM (aluminium composite material). Johansson said: “If timber cladding is being treated in the same way as ACM – it’s serious enough that it needs to be replaced – then why aren’t we being treated the same and receiving the same help?”

RMG said it had acted on safety advice from fire engineers, surveyors and Greater Manchester fire service regarding the cladding. Justin Herbert, an RMG operations director, said: “We are now looking to implement an integrated alarm system which will remove the need for the waking watch. The next stage will be to determine the long-term solution of addressing the cladding.

“We totally understand the concerns regarding the costs, which could not have been foreseen. We have to invoice to cover the costs in line with the lease covenants but will ensure we implement the most cost-effective compliant solution. We will continue to support the residents through this very difficult period.”

Back in Block D, Hallsworth and Johansson said they needed the uncertainty to end so they could move on. “I can’t minimise the effect this has had on us; it’s felt life-ruining. This was our future in this flat and now it feels like it’s taken our future from us. We thought we had escaped being ‘generation rent’; now we’re ‘generation stuck’,” Johansson said.

Andy Burnham, the mayor of Greater Manchester, said: “What really strikes me is the damage this is doing to people’s mental health. I was at a meeting of the High Rise Task Force and there were young people just in floods of tears, saying, ‘I can’t cope with this’, ‘It’s a living nightmare’. People should not be left in that kind of limbo with no peace of mind, not just about their safety but their finances as well.”

He said the government must ensure all unsafe cladding is removed and that residents should not have to pay for it. “It’s not the residents’ responsibility. When you buy a flat you are entitled to expect that the regulatory processes have created a flat that is safe. It is to be argued out between government and industry as to how much percentage liability there is for both sides.”

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com