Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Tema Port Terminal 3 rolling out more berthing capacity 7 months ahead of schedule« PrevNext »Comments (3)Listen to Article

usscmc by usscmc
December 6, 2019
Tema Port Terminal 3 rolling out more berthing capacity 7 months ahead of schedule« PrevNext »Comments (3)Listen to Article
Share on FacebookShare on Twitter

Since the successful opening of the new MPS Terminal 3 at Tema Port in June of this year with 700 meter of quay wall, First 2 New Berths, the project has continued to perform ahead of its deadline and today the project team are handing over to the operations another part of the water front at the Third New Berth (220m of the 300m Quay wall).

This new stretch of waterfront is being delivered 7 months ahead of the scheduled completion in June 2020. With this achievement the terminal now consists of 920 meters of available berth; 43 hectare of stacking space; 25 hectare of common user area and all required facilities.

The remaining 80 meters of Quay wall and a further 20 hectare of stacking space of the Third New Berth will be made available in Q1 2020, again several months ahead of schedule.

The New Port Operational facilities has been designed and integrated along with several automated processes and systems including scanners and weighbridges at the Gate-In and Gate-Out. These high-end technology and equipment has been synchronized with our fully integrated container terminal operations at the new port facility to eliminate congestion and maximize efficiency levels without compromising on security at the Port.

This expanded infrastructure is bringing numerous opportunities to the Shipping Lines starting with deploying larger vessels (gain from the economy of scale) and arrive to West Africa with deep draft and be able to lighten up vessels at Tema as first port call etc.

Combining MPS Terminal 3’s Location, infrastructure & superstructure, advanced terminal operating systems, efficient port accessibility, highest frequency calls, concentration of shipping lines, shortest waiting time, fastest vessel turnaround time, highest capacity and berth availability, MPS is well suited to provide the needed elements for a hub-feeder system where shipping lines can create regional services efficiently connecting Ghana’s Trade and Industry to the various West African ports and beyond.

The consequential benefits that Ghanaian shippers and consignees are deriving from Terminal 3 are shorter transit time, lower sea freight, connectivity to the port following Tema on the same vessel rotation and opening new trading routes in addition to effective penetration into new markets etc.

Between now and March 2020 and while ramping up operations on part of the Third New Berth, MPS shall start the final transition from Terminal 2 to terminal 3 and gradually wind down its operations at Terminal 2 which will be operated by GPHA.

The early takeover of Terminal 2 by GPHA will present significant prospect for the Multi-Purpose Vessels operators (RoRo, General Cargo, Break-Bulk, Tankers etc.) as well as the bulk commodity importers and exporters. The deeper draft and the potential investment in general cargo handling systems will bring about increased level of efficiency and savings adding value to the trade and the economy at large.

During the remainder of 2020 the Forth New Berth and reclamation of the areas behind it will also be completed far before their committed date in 2022.

Global trade, supply chains, production processes and countries’ economic integration are heavily dependent on Port efficient and the supporting logistics.

With the rolling out of the Africa Continental Free Trade Area (AfFCTA), Ghana is able to harness this opportunity in the areas of trade & industry, job creation and will significantly open up the economy to more industries and sustainable investments.

MPS’ Terminal 3 has its role cut out to provide the efficient connectivity between the Ghana’s importers and exporters with AfFCTA markets and beyond.
Source: Ghana Web

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com