Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Golden Predator Presents at Noble Capital Markets Conference

usscmc by usscmc
January 19, 2021
Golden Predator Presents at Noble Capital Markets Conference
Share on FacebookShare on Twitter

VANCOUVER, British Columbia, Jan. 18, 2021 (GLOBE NEWSWIRE) — Golden Predator Mining Corp. (TSX.V:GPY, OTCQX:NTGSF)(the “Company”) is pleased to announce that the Company’s Chief Executive Officer, Janet Lee-Sheriff, will present at NobleCon17 – Noble Capital Markets’ Seventeenth Annual Investor Conference on Tuesday, January 19, 2021 at 3:45 PM (EST). The conference is virtual, and available at no cost by registering at: www.nobleconference.com. A high-definition, video webcast of the presentation will be available the following day on the Company’s website and as a part of a complete catalog of presentations to be rebroadcast on Channelchek (www.channelchek.com) next month.

Brewery Creek Mine
The Brewery Creek Mine is a licensed brownfields heap leach gold mine that was from 1996 to 2002. The Company intends to resume mining and processing of licensed deposits when supported by an independent study that outlines technical and economic viability. The 180 km2 property is located 55 km east of Dawson City and is accessible year-round by paved and improved gravel roads. Significant infrastructure remains in place, allowing for a timely restart schedule under existing operating licenses.

A Bankable Feasibility Study (BFS) is being conducted by Kappes Cassiday & Associates of Reno, Nevada which will include a multi-year mine plan for the advancement of the Brewery Creek project. The BFS will include an inventory of the mineralized material remaining on the heap and mine planning (completed by Tetra Tech Inc of Golden, Colorado) for the resumption of the mining of material from leachable resources contained within the licensed area and reported in the Company’s Mineral Resource Estimate. The BFS will include all the key parameters involved in reconstructing or adding necessary infrastructure including a crushing facility, the Adsorption-Desorption-Recovery (“ADR”) plant and assay lab and an implementation schedule, sourcing, and economic cash flow model sufficiently detailed to move directly into procurement, development and construction if economically warranted. Any production decisions would be dependent on the outcome of a study demonstrating positive technical and economic viability.

About Golden Predator Mining Corp.
Golden Predator is advancing the past-producing Brewery Creek Mine towards a timely resumption of mining activities, under its Quartz Mining and Water Licenses, in Canada’s Yukon. With established resources grading over 1.0 g/t gold the Company is completing a Bankable Feasibility Study for the restart of heap leach operations. The Brewery Creek Mine project operates with a Socio Economic Accord with the Tr’ondëk Hwëch’in First Nation.

For additional information:
Janet Lee-Sheriff
Chief Executive Officer
(604) 260-8435
[email protected]
www.goldenpredator.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations that the Brewery Creek will advance to an early production decision, or the extent of any additional mineral resource that could result from incorporating 2019 exploration drilling. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions change.

Primary Logo

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com