Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

DVIDS – News – MCSC approves procurement of new LAV intercom system

usscmc by usscmc
January 24, 2020
DVIDS – News – MCSC approves procurement of new LAV intercom system
Share on FacebookShare on Twitter


MARINE CORPS BASE QUANTICO, Va.—In December 2019, the Program Manager for Light Armored Vehicles at Marine Corps Systems Command approved the initial procurement of the TOCNET-G4 Intercom System—or G4 ICS—for use in the Family of LAVs.

The G4 ICS is the LAV communication management system that allows Marines to easily communicate, both internally and externally, improving communication and situational awareness on the battlefield.

“We’re providing a communication capability that offers tremendous utility for Marines,” said Dan O’Conner, the project lead for Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance payloads and capabilities for PM LAV.

The G4 ICS is an easy-to-use tactical communication system comprising a user interface that adapts well to the operational environment of the LAV. The equipment provides enhanced audio quality and performance, said O’Conner.

The intercom also controls the entire communication suite within the LAV. The G4 ICS gives Marines a single point-of-control for radios, GPS systems and other technologies rather than having to independently manage each system.

“Not only is it simple to use, [G4 ICS] is interoperable with the existing communication suite within the Marine Corps platform,” said Kim Bowen, deputy program manager for LAV. “It also has the ability to easily add a wireless capability.”

In 2017, the Light Armored Reconnaissance Operational Advisory Group identified upgrading the LAV intercom system as their top priority after receiving complaints from Marines about the legacy ICS. A frequent criticism was the older-generation ICS experienced shutdowns causing a loss of communication and lengthy reboot times.

The G4 ICS is a modern ICS that is more fault-tolerant to LAV electrical fluctuations that cause ICS shutdowns and subsequent reboots. In the unlikely event that the G4 ICS does reboot, the G4 ICS will reboot in a few seconds, said O’Conner.

Stakeholder involvement

PM LAV incorporated Marine Corps stakeholders into the evaluation, assessment and selection process of the new ICS to ensure all parties participated in the selection of the system. The acquisition approach focused on assessing the technology’s value and utility for end users, and strategically conducting test and evaluation trials early in the process to better inform decisions, said O’Conner.

“By doing this, we can deliver an improved ICS to the fleet approximately a year earlier than if we followed traditional acquisition methods,” said O’Conner.

In June 2018, PM LAV conducted market research seeking viable candidates for a replacement intercom system. In April 2019, Marines representing all Light Armored Reconnaissance battalions assessed three candidate systems in a Systems Integration Lab during a user evaluation to provide feedback on performance, utility and usability.

After narrowing the search to two systems, a Limited User Evaluation took place in Twentynine Palms, California, and finished at Camp Pendleton, California, in August 2019.

In November 2019, Marine Corps Operational Test and Evaluation Activity—who helped plan the LUE and managed the conduct of the evaluation—provided an independent System Assessment Report, which provided data to support the selection of the G4 ICS. The SAR provided data that clearly showed the G4 ICS performed superior to its competitor.

“We wanted a reliable and easy-to-maintain system that would meet the current and future needs of the user.” said Steve Myers, MCSC’s program manager for LAV. “That is why [Marines] were involved in every step of the process.”

Initial Operational Capability for the new ICS is scheduled for fiscal year 2021, and Full Operational Capability is slated for fiscal year 2022.







Date Taken: 01.23.2020
Date Posted: 01.23.2020 13:24
Story ID: 360074
Location: MARINE CORPS BASE QUANTICO, VA., VA, US






Web Views: 46
Downloads: 0
Podcast Hits: 0


PUBLIC DOMAIN  

This work, MCSC approves procurement of new LAV intercom system, by Matt Gonzales, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com