Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us
No Result
View All Result
No Result
View All Result
Home Supply Chain Updates

Sound Transit awards multi-year maintenance contract to Advanced Rail Management

usscmc by usscmc
January 17, 2021
Sound Transit awards multi-year maintenance contract to Advanced Rail Management
Share on FacebookShare on Twitter

Advanced Rail Management, Corp. (ARM), has been awarded a multi-year, $24-million contract from Sound Transit for rail grinding, polishing and engineering inspection services.

The contract, which includes corrugation measurement and track geometry, ultrasonic and eddy current testing as part of the inspection and quality assurance requirements, is among the most comprehensive rail assessment and maintenance contracts awarded by a North American transit agency, says ARM. This contract is the first of its kind in North America to require rail polishing that adheres to customized acoustic requirements that are based on the ISO 3095 standard, which is considerably more demanding than the EN 13231-3 standard that North American railroads and transit systems typically grind to, according to the company.

“Sound Transit’s approach to looking after rail integrity, wear and noise and vibration generated by the rail surface finish has resulted in achieving a high level of standards compared to other North American rail systems in the realm of rail grinding and maintenance programs,” said ARM President Gordon Bachinsky.

To achieve Sound Transit’s goals, ARM, along with the National Research Council of Canada, an ARM consultant on the project, will implement a gradual-preventive grinding program. Through its comprehensive project team, ARM will have access to a variety of hi-rail and railbound rail grinding equipment fitted with coarse to extra-fine-grit grinding stones, depending on the metal-removal and surface-finish requirements. Milling equipment will also be available if needed to address surface damage requiring extensive metal removal.

To prepare for the grinding / polishing program, ARM and its consultants will conduct a comprehensive inspection to quantify rail surface conditions on the system.

Measurement will include:

  • Systemwide track geometry testing of all typical parameters, such as curvature, gauge, profile, alignment, etc. It will also include optical rail profile measurement.
  • Ultrasonic testing (UT), which will identify internal rail defects, including detail fractures from shelling, broken or fractured rail base, defective plant or field welds, bolt-hole cracks, etc., by type, size, and location. Squats and surface cracks that are identified by the UT test vehicle will be verified by hand tests.
  • Pre- and post-grind eddy current testing, which will measure surface crack length, depth and geometry; proximity to other cracks; and electromagnetic properties of the rail base material. Reports will include measurements, graphs, images and trending reports; defects will be color coded to distinguish the severity.
  • Corrugation measurement collected by a Corrugation Analysis Trolley (CAT), including roughness measurements that reference the guidelines of ISO 3095.

ARM will use data from these measurements to prioritize locations, estimate metal removal and the number of passes that will be required and determine the total number of miles to be addressed in order to establish an effective gradual-preventive grinding program. Corrugation measurement data will be used to guide rail polishing efforts to meet Sound Transit’s five- micrometer surface roughness target within the wheel/rail running band.

“Sound Transit’s grinding and polishing acceptance criteria will ensure that the wavelength signature of the finished rail will mitigate the types of noise and vibration-related problems previously encountered on the system,” said Mark Reimer, ARM’s director of business development & projects.

The five-year contract, which may be extended for five additional one-year terms, applies to Sound Transit’s existing Link Light Rail, as well as new line extensions, including the I-90 floating bridge across Lake Washington.

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com