The Purpose of the Estimate

usscmc by usscmc
January 6, 2020
The Purpose of the Estimate
Share on FacebookShare on Twitter

Like any industry, blame and accolades are an inevitable part of the electrical contracting business. I once heard someone say, “If you could buy people for what they are worth and sell them for what they think they are worth, you would be a millionaire.” Who knows, that might be an understatement — maybe make that a billionaire.

In my electrical contracting experience, when a project makes money, credit is usually chalked up to the project manager’s expertise. When a project loses money, the estimator is typically blamed for a bad estimate. The fact is the connection between estimating and project management is inseparable. The project manager would be out of a job without the estimator. This means a quality estimator and project manager are both necessary for a company to make a profit; therefore, both must share the blame for loss and the praise for success.

How does this work? The estimator must be accurate, and the project manager must be efficient. Accuracy, as well as efficiency, can be measured. Estimators should have benchmarks by which an estimate is analyzed to determine if it is accurate and correct. Following are some benchmarks that should be considered:

1. Labor hours per square foot — When tracking labor hours per square foot, the estimator will begin to see a pattern develop. This pattern will become predictable for similar projects. Labor hours per square foot of the current project being bid should be compared to similar project types previously bid.

2. Labor hours per device in all systems — i.e., lighting, branch, fire alarm.

3. Average length of conduit and wire or cable per device in all systems.

4. System with the largest percentage of labor — Projects are comprised of various systems, such as lighting, branch wiring, feeders, fire alarm, data, and generators. Depending on the type of project, the percentage of labor in each of these systems will vary from one project to another. For example, if the lighting system contains 40% of the labor and the fire alarm is only 5% of the total labor, a close review of the lighting system is necessary. 

5. Accurate material pricing — Both basic materials packages must be priced at market levels. Failure to maintain a method of keeping up with current pricing will increase the risk to minimize profits. 

6. Competitively quoted complete packages — Obtaining at least three quotations each for lighting fixtures, switchgear, and generators will help the contractor know that current market prices levels are being quoted. The contractor must maintain a good relationship with suppliers in order to receive competitive pricing. 

7. Total percentage of quoted packages of the total project costs.

8. Material items with the largest total costs — For some projects, 7% of the total number of items can account for 90% of the total material costs. For instance, a project with 230 electrical items in the estimate, 90% of the material costs may be comprised of only 16 items. The estimator must ensure accurate pricing has been included in the estimate for the items that comprise the largest percentage of material costs. 

9. Schedule vs. the crew size to determine supervision costs — The project schedule must be considered when determining the final price of a project. An accelerated schedule requires more workers, and workers must be supervised. Depending on the project, a full-time nonworking foreman may be required. 

Of course, these benchmarks will vary from project to project, especially between commercial projects, industrial projects, and correctional facilities. Just as an estimator has benchmarks to analyze accuracy, the project manager must have benchmarks to determine efficiency. Here are some benchmarks for the project manager:

• Time — How are we doing with the project schedule? The project schedule is controlled by the general contractor for most projects. Thus, the site foreman must monitor the project completion progress. If the schedule is not being maintained, this must be documented by the electrical contractor.

• Costs — Is the project under budget or the estimate?

• Percentage complete vs. percentage of total costs — When the percentage of total costs is greater than the percentage of the completion, a problem may exist. Tracking this comparison sooner rather than later is best. 

• Resources — How much time, staff, and equipment are you using? Are you committing too much in management without a return? Is there any unused rental equipment on the project that should be returned? 

• Scope — Is there scope creep or seep? Creep is uncontrolled or unauthorized changes. This occurs when the client wants work done at no costs. Scope seep is “allowed extras” without charge by the project manager. The project must be kept within the limits of the estimate.

• Performance — Are you meeting estimated labor units, including labor factors such as loss time, overtime, or multi-story effect? This includes performance of the general contractor. 

• Risks — Are the project risks being managed? The project manager must monitor any changes to the project’s schedule, work sequence, and staging areas. If these items are interrupted by the owner or general contractor, the electrical contractor should be entitled to compensation for additional labor and loss of labor productivity. 

• Quality — How is the quality or your work? Are electricians correcting and fixing unacceptable work due to poor planning and management? The project manager must provide the necessary information, materials, and tools for work that conforms to the contract documents. The contractor’s work is judged by these documents. 

At the end of the project, you should compare the estimator’s accuracy to the project manager’s efficiency. That way, you can truly know who should be praised and who should shoulder the blame. The real prize, however, is not in blaming or praising. It’s in the ability to arrive at solutions that enhance both the accuracy of estimating and the efficiency of project managing. When you stop placing blame and start seeking profit-making solutions, only then will you arrive at the true spirit of successful contracting — teamwork at its best.    

Kiper is an independent electrical estimating trainer and consultant based in Niagara Falls, N.Y. He can be reached at [email protected].

usscmc

usscmc

No Result
View All Result

Recent Posts

  • How Hapag Lloyd captured a major market share in the Container Shipping Industry in USA
  • Why USA’s East Coast is the Favorite Destination for Manufacturing Companies
  • How Trade Relations Between the USA and UK Improved After Keir Starmer Became Prime Minister
  • Tips and Tricks for Procurement Managers to Handle Their Supplier Woes
  • The Crazy Supply Chain of Walmart Spanning Across the Globe

Recent Comments

  • Top 5 Supply Chain Certifications that are in high demand | Top 5 Certifications on Top 5 Globally Recognized Supply Chain Certifications
  • 3 Best Procurement Certifications that are most valuable | Procurement Newz on Top 5 Globally Recognized Supply Chain Certifications

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019

Categories

  • Global News
  • Supply Chain Updates

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Antispam
  • Contact Us
  • Disclaimer
  • Home
  • Privacy Policy
  • Terms of Use

© 2025 www.usscmc.com

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • Supply Chain Updates
  • Global News
  • Contact Us

© 2025 www.usscmc.com